|
Installation in Solid Concrete 1. Drill hole to specified diameter and depth
2. Remove dust and debris by brushing and blowing 3 times each (If hole is wet or flooded, remove excess water with wet/dry vacuum)
3. Screw mixing nozzle onto cartridge and dispense 2-3 trigger pulls of adhesive to waste until colour is green / grey with no streaks
4. Insert tip of nozzle to bottom of hole and dispense adhesive
5. Fill hole to about 2/3 full
6. Insert threaded stud or reinforcing bar with rotating motion to release trapped air
7. Wait until adhesive has fully cured before loading (see Working / Loading Time chart below)
8. Clean up with acetone
Refer to Technical Data Sheet and MSDS available from www.ramset.com.au, for precautions and further detailed installation instructions

|