|
1. Drill or core hole to specified diameter and depth
2. Remove dust and debris by brushing and blowing 3 times each (If hole is wet or flooded remove water with wet/dry vacuum)
3. Screw mixing nozzle onto cartridge and dispense 2-3 trigger pulls of adhesive to waste until colour is dark grey with no streaks
4. Insert tip of nozzle to bottom of hole and dispense adhesive
5. Fill hole to about 2/3 full
6. Insert threaded stud or reinforcing bar with rotating motion to release trapped air
7. Wait until adhesive has fully cured before loading (see Working / Loading Time chart below)
9. Clean up with acetone
Refer to Technical Data Sheet and MSDS available from www.ramset.com.au, for precautions and further detailed installation instructions


|